O.A.R: THREE DAYS IN THE STUDIO

STUDIOS READY FOR ANYTHING
Before O.A.R's amphitheater run hit the road, the show was built and programmed at LMG's Orlando rehearsal studio. The tour's creative team came together and spent three days at LMG with access to the fully-built rig before sending it on the road.
LMG provided the tour with a lighting and rigging package featuring ACME Pixellines, Robe Esprites and over 90x Robe Spiiders. The rig was packaged with an extreme efficiency of space, fitting all of lighting and rigging into a single truck. LMG staffed the tour with one lighting technician that supported the tour's lighting director / L1.
Lighting Designer: Jeremy Lechterman
Lighting Programmer: Joshua Lowenstein
Lighting Director: Zakk Bosserman

